County Road 3 over E Br L Hocking * Reynold
GoodWashington County, Ohio · 3.7 MI East of JCT SR 339 · Structure no. 8439338
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 1,125
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 3 over E Br L Hocking * Reynold is a prestressed concrete box beam or girders - multiple carrying County Road 3 over E Br L Hocking * Reynold in Washington County, Ohio. It was built in 1984, so it is 41 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,125 vehicles a day, roughly 3% of them trucks, projected to reach 1,562 by 2035. The structure is 58 ft (17.7 m) long and 28 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 3 over E Br L Hocking * Reynold built?
It was built in 1984, making it 41 years old in 2025.
What condition is County Road 3 over E Br L Hocking * Reynold in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does County Road 3 over E Br L Hocking * Reynold carry?
About 1,125 vehicles per day (2015 count), of which roughly 3% are trucks.
How long is County Road 3 over E Br L Hocking * Reynold?
The structure is 58 ft (17.7 m) long with a longest span of 53 ft (16.2 m) and a deck 28 ft wide.
Who owns County Road 3 over E Br L Hocking * Reynold?
It is owned by the County Highway Agency.