County Road 3 over E Br L Hocking Hopkins#
GoodWashington County, Ohio · 0.3 Mi.Sw of Int.Cr 27 · Structure no. 8430144
- Built
- 1963
- 62 years old, rebuilt 1994
- Condition
- Good
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 1,169
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 3 over E Br L Hocking Hopkins# is a prestressed concrete box beam or girders - multiple carrying County Road 3 over E Br L Hocking Hopkins# in Washington County, Ohio. It was built in 1963 and reconstructed in 1994, so it is 62 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,169 vehicles a day, roughly 2% of them trucks, projected to reach 1,623 by 2035. The structure is 42 ft (12.8 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 3 over E Br L Hocking Hopkins# built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1994.
What condition is County Road 3 over E Br L Hocking Hopkins# in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does County Road 3 over E Br L Hocking Hopkins# carry?
About 1,169 vehicles per day (2015 count), of which roughly 2% are trucks.
How long is County Road 3 over E Br L Hocking Hopkins#?
The structure is 42 ft (12.8 m) long with a longest span of 37 ft (11.3 m) and a deck 24 ft wide.
Who owns County Road 3 over E Br L Hocking Hopkins#?
It is owned by the County Highway Agency.