County Road 25 Ext over Puncheon Fork
FairVinton County, Ohio · .2 MI S of JCT US 50 · Structure no. 8230889
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 76 ft
- 1 main span
- Daily traffic
- 217
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 25 Ext over Puncheon Fork is a prestressed concrete box beam or girders - multiple carrying County Road 25 Ext over Puncheon Fork in Vinton County, Ohio. It was built in 1978, so it is 47 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 217 vehicles a day, roughly 8% of them trucks, projected to reach 301 by 2035. The structure is 76 ft (23.2 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 25 Ext over Puncheon Fork built?
It was built in 1978, making it 47 years old in 2025.
What condition is County Road 25 Ext over Puncheon Fork in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does County Road 25 Ext over Puncheon Fork carry?
About 217 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is County Road 25 Ext over Puncheon Fork?
The structure is 76 ft (23.2 m) long with a longest span of 75 ft (22.9 m) and a deck 28 ft wide.
Who owns County Road 25 Ext over Puncheon Fork?
It is owned by the County Highway Agency.