SR 93 over Puncheon Frk (raccoon)
FairVinton County, Ohio · 0.34M S of JCT Usr 50 · Structure no. 8201005
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 5,646
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 93 over Puncheon Frk (raccoon) is a prestressed concrete box beam or girders - multiple carrying SR 93 over Puncheon Frk (raccoon) in Vinton County, Ohio. It was built in 1986, so it is 39 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,646 vehicles a day, roughly 8% of them trucks, projected to reach 7,837 by 2035. The structure is 47 ft (14.3 m) long and 36 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 93 over Puncheon Frk (raccoon) built?
It was built in 1986, making it 39 years old in 2025.
What condition is SR 93 over Puncheon Frk (raccoon) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does SR 93 over Puncheon Frk (raccoon) carry?
About 5,646 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is SR 93 over Puncheon Frk (raccoon)?
The structure is 47 ft (14.3 m) long with a longest span of 45 ft (13.7 m) and a deck 36 ft wide.
Who owns SR 93 over Puncheon Frk (raccoon)?
It is owned by the State Highway Agency.