US Bridges

Usr 33 over Over SR245

Good

Union County, Ohio · 7.05 MI N. of SR739 · Structure no. 8001073

Built
1988
37 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
138 ft
3 main spans
Daily traffic
14,856
2018 count
Owner
State
State Highway Agency

About this bridge

Usr 33 over Over SR245 is a prestressed concrete box beam or girders - multiple carrying Usr 33 over Over SR245 in Union County, Ohio. It was built in 1988, so it is 37 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,856 vehicles a day, roughly 12% of them trucks, projected to reach 20,620 by 2038. The structure is 138 ft (42.2 m) long and 42 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUsr 33
CrossesOver SR245
Location7.05 MI N. of SR739
RouteU.S. Route 33
StateOhio
Coordinates40.23865, -83.40976
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating28.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length138 ft (42.2 m)
Longest span53 ft (16.3 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,856 (2018)
Projected traffic20,620 by 2038
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Usr 33 over Over SR245 built?

It was built in 1988, making it 37 years old in 2025.

What condition is Usr 33 over Over SR245 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Usr 33 over Over SR245 carry?

About 14,856 vehicles per day (2018 count), of which roughly 12% are trucks.

How long is Usr 33 over Over SR245?

The structure is 138 ft (42.2 m) long with a longest span of 53 ft (16.3 m) and a deck 42 ft wide.

Who owns Usr 33 over Over SR245?

It is owned by the State Highway Agency.