US Bridges

Usr 33 over Over SR245

Fair

Union County, Ohio · 7.05 MI N of SR739 · Structure no. 8001065

Built
1988
37 years old
Condition
Fair
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
138 ft
3 main spans
Daily traffic
14,856
2018 count
Owner
State
State Highway Agency

About this bridge

Usr 33 over Over SR245 is a prestressed concrete box beam or girders - multiple carrying Usr 33 over Over SR245 in Union County, Ohio. It was built in 1988, so it is 37 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,856 vehicles a day, roughly 12% of them trucks, projected to reach 20,620 by 2038. The structure is 138 ft (42.2 m) long and 42 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUsr 33
CrossesOver SR245
Location7.05 MI N of SR739
RouteU.S. Route 33
StateOhio
Coordinates40.23875, -83.40948
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating25 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length138 ft (42.2 m)
Longest span53 ft (16.3 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,856 (2018)
Projected traffic20,620 by 2038
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Usr 33 over Over SR245 built?

It was built in 1988, making it 37 years old in 2025.

What condition is Usr 33 over Over SR245 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Usr 33 over Over SR245 carry?

About 14,856 vehicles per day (2018 count), of which roughly 12% are trucks.

How long is Usr 33 over Over SR245?

The structure is 138 ft (42.2 m) long with a longest span of 53 ft (16.3 m) and a deck 42 ft wide.

Who owns Usr 33 over Over SR245?

It is owned by the State Highway Agency.