US Bridges

Cedar St. over Conrail and Oh Canal 107

Fair

Summit County, Ohio · Bowery to S.Main Sts. · Structure no. 7760124

Built
1953
72 years old, rebuilt 1987
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
431 ft
6 main spans
Daily traffic
10,350
2007 count
Owner
State
State Highway Agency

About this bridge

Cedar St. over Conrail and Oh Canal 107 is a steel continuous stringer/multi-beam or girder carrying Cedar St. over Conrail and Oh Canal 107 in Summit County, Ohio. It was built in 1953 and reconstructed in 1987, so it is 72 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,350 vehicles a day, roughly 2% of them trucks, projected to reach 14,366 by 2027. The structure is 431 ft (131.4 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCedar St.
CrossesConrail and Oh Canal 107
LocationBowery to S.Main Sts.
RouteState Highway 261
StateOhio
Coordinates41.07628, -81.52484
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57.1 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadH 20
Structure length431 ft (131.4 m)
Longest span78 ft (23.8 m)
Deck width57 ft (17.4 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,350 (2007)
Projected traffic14,366 by 2027
Trucks2%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Cedar St. over Conrail and Oh Canal 107 built?

It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1987.

What condition is Cedar St. over Conrail and Oh Canal 107 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Cedar St. over Conrail and Oh Canal 107 carry?

About 10,350 vehicles per day (2007 count), of which roughly 2% are trucks.

How long is Cedar St. over Conrail and Oh Canal 107?

The structure is 431 ft (131.4 m) long with a longest span of 78 ft (23.8 m) and a deck 57 ft wide.

Who owns Cedar St. over Conrail and Oh Canal 107?

It is owned by the State Highway Agency.