US Bridges

High-Main Viaduct over Garage Dr-Goodrich (150)

Fair

Summit County, Ohio · W. of Bf Goodrich Bldg. · Structure no. 7760019

Built
1971
54 years old, rebuilt 2005
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
982 ft
13 main spans
Daily traffic
12,506
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

High-Main Viaduct over Garage Dr-Goodrich (150) is a steel continuous stringer/multi-beam or girder carrying High-Main Viaduct over Garage Dr-Goodrich (150) in Summit County, Ohio. It was built in 1971 and reconstructed in 2005, so it is 54 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,506 vehicles a day, roughly 7% of them trucks, projected to reach 17,358 by 2035. The structure is 982 ft (299.3 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHigh-Main Viaduct
CrossesGarage Dr-Goodrich (150)
LocationW. of Bf Goodrich Bldg.
RouteCity Street 5652
StateOhio
Coordinates41.07248, -81.5235
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating67.9 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans13
Design loadHS 20 + Mod
Structure length982 ft (299.3 m)
Longest span116 ft (35.4 m)
Deck width48 ft (14.6 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,506 (2015)
Projected traffic17,358 by 2035
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was High-Main Viaduct over Garage Dr-Goodrich (150) built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2005.

What condition is High-Main Viaduct over Garage Dr-Goodrich (150) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does High-Main Viaduct over Garage Dr-Goodrich (150) carry?

About 12,506 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is High-Main Viaduct over Garage Dr-Goodrich (150)?

The structure is 982 ft (299.3 m) long with a longest span of 116 ft (35.4 m) and a deck 48 ft wide.

Who owns High-Main Viaduct over Garage Dr-Goodrich (150)?

It is owned by the City or Municipal Highway Agency.