US Bridges

SR8 SB Tpk Ramp over I80 Ohio Turnpike

Good

Summit County, Ohio · 3.24 MI S of I-271 · Structure no. 7729774

Built
2010
15 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
221 ft
2 main spans
Daily traffic
52,020
2010 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR8 SB Tpk Ramp over I80 Ohio Turnpike is a steel continuous stringer/multi-beam or girder carrying SR8 SB Tpk Ramp over I80 Ohio Turnpike in Summit County, Ohio. It was built in 2010, so it is 15 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52,020 vehicles a day, roughly 13% of them trucks, projected to reach 4,469 by 2030. The structure is 221 ft (67.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR8 SB Tpk Ramp
CrossesI80 Ohio Turnpike
Location3.24 MI S of I-271
RouteState Highway 8
StateOhio
Coordinates41.25831, -81.50186
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length221 ft (67.4 m)
Longest span120 ft (36.7 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52,020 (2010)
Projected traffic4,469 by 2030
Trucks13%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR8 SB Tpk Ramp over I80 Ohio Turnpike built?

It was built in 2010, making it 15 years old in 2025.

What condition is SR8 SB Tpk Ramp over I80 Ohio Turnpike in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR8 SB Tpk Ramp over I80 Ohio Turnpike carry?

About 52,020 vehicles per day (2010 count), of which roughly 13% are trucks.

How long is SR8 SB Tpk Ramp over I80 Ohio Turnpike?

The structure is 221 ft (67.4 m) long with a longest span of 120 ft (36.7 m) and a deck 36 ft wide.

Who owns SR8 SB Tpk Ramp over I80 Ohio Turnpike?

It is owned by the State Toll Authority.