US Bridges

Frontage RD over I80 Oh Tpk

Good

Summit County, Ohio · 3.25 MI S of Ir 271 · Structure no. 7700741

Built
2009
16 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
249 ft
4 main spans
Daily traffic
14,030
2009 count
Owner
State
State Highway Agency

About this bridge

Frontage RD over I80 Oh Tpk is a prestressed concrete continuous box beam or girders - multiple carrying Frontage RD over I80 Oh Tpk in Summit County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,030 vehicles a day, projected to reach 19,474 by 2029. The structure is 249 ft (76 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFrontage RD
CrossesI80 Oh Tpk
Location3.25 MI S of Ir 271
RouteCity Street 5704
StateOhio
Coordinates41.2581, -81.50437
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating103.6 US tons
Inventory rating60.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length249 ft (76 m)
Longest span73 ft (22.1 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,030 (2009)
Projected traffic19,474 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Frontage RD over I80 Oh Tpk built?

It was built in 2009, making it 16 years old in 2025.

What condition is Frontage RD over I80 Oh Tpk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Frontage RD over I80 Oh Tpk carry?

About 14,030 vehicles per day (2009 count).

How long is Frontage RD over I80 Oh Tpk?

The structure is 249 ft (76 m) long with a longest span of 73 ft (22.1 m) and a deck 55 ft wide.

Who owns Frontage RD over I80 Oh Tpk?

It is owned by the State Highway Agency.