Ir 271 over Ir 271 NB over SR 82
GoodSummit County, Ohio · JCT of Ir 271 and SR 82 · Structure no. 7710003
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 121 ft
- 1 main span
- Daily traffic
- 51,830
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Ir 271 over Ir 271 NB over SR 82 is a prestressed concrete stringer/multi-beam or girder carrying Ir 271 over Ir 271 NB over SR 82 in Summit County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 51,830 vehicles a day, roughly 17% of them trucks, projected to reach 58,650 by 2035. The structure is 121 ft (37 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ir 271 over Ir 271 NB over SR 82 built?
It was built in 2015, making it 10 years old in 2025.
What condition is Ir 271 over Ir 271 NB over SR 82 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does Ir 271 over Ir 271 NB over SR 82 carry?
About 51,830 vehicles per day (2015 count), of which roughly 17% are trucks.
How long is Ir 271 over Ir 271 NB over SR 82?
The structure is 121 ft (37 m) long with a longest span of 120 ft (36.5 m) and a deck 63 ft wide.
Who owns Ir 271 over Ir 271 NB over SR 82?
It is owned by the State Highway Agency.