I.R. 271 over I 271 NB over SR 8
GoodSummit County, Ohio · JCT of Ir 271 and SR 8 · Structure no. 7709366
- Built
- 1967
- 58 years old, rebuilt 2008
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 339 ft
- 4 main spans
- Daily traffic
- 20,052
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I.R. 271 over I 271 NB over SR 8 is a steel continuous stringer/multi-beam or girder carrying I.R. 271 over I 271 NB over SR 8 in Summit County, Ohio. It was built in 1967 and reconstructed in 2008, so it is 58 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,052 vehicles a day, roughly 16% of them trucks, projected to reach 27,832 by 2035. The structure is 339 ft (103.3 m) long and 92 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I.R. 271 over I 271 NB over SR 8 built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2008.
What condition is I.R. 271 over I 271 NB over SR 8 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does I.R. 271 over I 271 NB over SR 8 carry?
About 20,052 vehicles per day (2015 count), of which roughly 16% are trucks.
How long is I.R. 271 over I 271 NB over SR 8?
The structure is 339 ft (103.3 m) long with a longest span of 115 ft (35.1 m) and a deck 92 ft wide.
Who owns I.R. 271 over I 271 NB over SR 8?
It is owned by the State Highway Agency.