SR 18 over SR 59 & Ohio Canal Trail
FairSummit County, Ohio · JCT of SR 18 and SR 59 · Structure no. 7700989
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 226 ft
- 2 main spans
- Daily traffic
- 21,579
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 18 over SR 59 & Ohio Canal Trail is a steel continuous stringer/multi-beam or girder carrying SR 18 over SR 59 & Ohio Canal Trail in Summit County, Ohio. It was built in 1971, so it is 54 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,579 vehicles a day, roughly 6% of them trucks, projected to reach 29,952 by 2035. The structure is 226 ft (68.9 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 18 over SR 59 & Ohio Canal Trail built?
It was built in 1971, making it 54 years old in 2025.
What condition is SR 18 over SR 59 & Ohio Canal Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does SR 18 over SR 59 & Ohio Canal Trail carry?
About 21,579 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is SR 18 over SR 59 & Ohio Canal Trail?
The structure is 226 ft (68.9 m) long with a longest span of 110 ft (33.5 m) and a deck 98 ft wide.
Who owns SR 18 over SR 59 & Ohio Canal Trail?
It is owned by the State Highway Agency.