US Bridges

SR 823 over Webster St. (SR-140)

Good

Scioto County, Ohio · 0.25 Miles East U.S. 52 · Structure no. 7306318

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
106 ft
1 main span
Daily traffic
13,100
2020 count
Owner
State
State Highway Agency

About this bridge

SR 823 over Webster St. (SR-140) is a prestressed concrete stringer/multi-beam or girder carrying SR 823 over Webster St. (SR-140) in Scioto County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,100 vehicles a day, roughly 8% of them trucks, projected to reach 18,183 by 2040. The structure is 106 ft (32.3 m) long and 58 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesSR 823
CrossesWebster St. (SR-140)
Location0.25 Miles East U.S. 52
RouteState Highway 823
StateOhio
Coordinates38.75388, -82.87317
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.1 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length106 ft (32.3 m)
Longest span102 ft (31.1 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,100 (2020)
Projected traffic18,183 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 823 over Webster St. (SR-140) built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR 823 over Webster St. (SR-140) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 823 over Webster St. (SR-140) carry?

About 13,100 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is SR 823 over Webster St. (SR-140)?

The structure is 106 ft (32.3 m) long with a longest span of 102 ft (31.1 m) and a deck 58 ft wide.

Who owns SR 823 over Webster St. (SR-140)?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).