SR-823 NB Ramp a over Ohio River Rd. C.R. 503
GoodScioto County, Ohio · .072 Miles N. of US-52 · Structure no. 7306296
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 189 ft
- 1 main span
- Daily traffic
- 4,100
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SR-823 NB Ramp a over Ohio River Rd. C.R. 503 is a prestressed concrete stringer/multi-beam or girder carrying SR-823 NB Ramp a over Ohio River Rd. C.R. 503 in Scioto County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,100 vehicles a day, roughly 10% of them trucks, projected to reach 5,691 by 2040. The structure is 189 ft (57.6 m) long and 34 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-823 NB Ramp a over Ohio River Rd. C.R. 503 built?
It was built in 2018, making it 7 years old in 2025.
What condition is SR-823 NB Ramp a over Ohio River Rd. C.R. 503 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR-823 NB Ramp a over Ohio River Rd. C.R. 503 carry?
About 4,100 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is SR-823 NB Ramp a over Ohio River Rd. C.R. 503?
The structure is 189 ft (57.6 m) long with a longest span of 171 ft (52.2 m) and a deck 34 ft wide.
Who owns SR-823 NB Ramp a over Ohio River Rd. C.R. 503?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).