Usr 24 EB over Maumee & Western (rmw) R
GoodPaulding County, Ohio · .25 Miles East of US 127 · Structure no. 6300308
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 89 ft
- 1 main span
- Daily traffic
- 3,434
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 24 EB over Maumee & Western (rmw) R is a prestressed concrete stringer/multi-beam or girder carrying Usr 24 EB over Maumee & Western (rmw) R in Paulding County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,434 vehicles a day, roughly 42% of them trucks, projected to reach 4,766 by 2035. The structure is 89 ft (27.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 24 EB over Maumee & Western (rmw) R built?
It was built in 2009, making it 16 years old in 2025.
What condition is Usr 24 EB over Maumee & Western (rmw) R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Usr 24 EB over Maumee & Western (rmw) R carry?
About 3,434 vehicles per day (2015 count), of which roughly 42% are trucks.
How long is Usr 24 EB over Maumee & Western (rmw) R?
The structure is 89 ft (27.2 m) long with a longest span of 84 ft (25.6 m) and a deck 45 ft wide.
Who owns Usr 24 EB over Maumee & Western (rmw) R?
It is owned by the State Highway Agency.