US Bridges

Usr 24 WB over CR 105 & Portland RR

Good

Paulding County, Ohio · US-24 over CR-105 · Structure no. 6300316

Built
2009
16 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
252 ft
3 main spans
Daily traffic
4,854
2015 count
Owner
State
State Highway Agency

About this bridge

Usr 24 WB over CR 105 & Portland RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Usr 24 WB over CR 105 & Portland RR in Paulding County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,854 vehicles a day, roughly 42% of them trucks, projected to reach 6,737 by 2035. The structure is 252 ft (76.8 m) long and 45 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUsr 24 WB
CrossesCR 105 & Portland RR
LocationUS-24 over CR-105
RouteU.S. Route 24
StateOhio
Coordinates41.21199, -84.60248
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.9 US tons
Inventory rating32.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length252 ft (76.8 m)
Longest span80 ft (24.5 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,854 (2015)
Projected traffic6,737 by 2035
Trucks42%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Usr 24 WB over CR 105 & Portland RR built?

It was built in 2009, making it 16 years old in 2025.

What condition is Usr 24 WB over CR 105 & Portland RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Usr 24 WB over CR 105 & Portland RR carry?

About 4,854 vehicles per day (2015 count), of which roughly 42% are trucks.

How long is Usr 24 WB over CR 105 & Portland RR?

The structure is 252 ft (76.8 m) long with a longest span of 80 ft (24.5 m) and a deck 45 ft wide.

Who owns Usr 24 WB over CR 105 & Portland RR?

It is owned by the State Highway Agency.