US Bridges

SR 564 over Stream

Fair

Noble County, Ohio · 5.57M W of JCT SR145 · Structure no. 6104509

Built
1954
71 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
24 ft
1 main span
Daily traffic
358
2015 count
Owner
State
State Highway Agency

About this bridge

SR 564 over Stream is a prestressed concrete stringer/multi-beam or girder carrying SR 564 over Stream in Noble County, Ohio. It was built in 1954, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 358 vehicles a day, roughly 7% of them trucks, projected to reach 497 by 2035. The structure is 24 ft (7.3 m) long and 22 ft wide. If it were closed, the detour would be 37.9 mi (61 km).

CarriesSR 564
CrossesStream
Location5.57M W of JCT SR145
RouteState Highway 564
StateOhio
Coordinates39.67904, -81.39381
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length24 ft (7.3 m)
Longest span21 ft (6.4 m)
Deck width22 ft (6.7 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic358 (2015)
Projected traffic497 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.9 mi (61 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 564 over Stream built?

It was built in 1954, making it 71 years old in 2025.

What condition is SR 564 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does SR 564 over Stream carry?

About 358 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 564 over Stream?

The structure is 24 ft (7.3 m) long with a longest span of 21 ft (6.4 m) and a deck 22 ft wide.

Who owns SR 564 over Stream?

It is owned by the State Highway Agency.