SR 564 over Stream

Good

Noble County, Ohio · 5.8 MI W of JCT SR 145 · Structure no. 6104487

Built
1997
28 years old
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
358
2015 count
Owner
State
State Highway Agency

About this bridge

SR 564 over Stream is a prestressed concrete box beam or girders - multiple carrying SR 564 over Stream in Noble County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 358 vehicles a day, roughly 7% of them trucks, projected to reach 497 by 2035. The structure is 42 ft (12.9 m) long and 34 ft wide. If it were closed, the detour would be 37.9 mi (61 km).

CarriesSR 564
CrossesStream
Location5.8 MI W of JCT SR 145
RouteState Highway 564
StateOhio
Coordinates39.68007, -81.39874
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating51 US tons
Inventory rating26.8 US tons

Structure

MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length42 ft (12.9 m)
Longest span41 ft (12.5 m)
Deck width34 ft (10.4 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic358 (2015)
Projected traffic497 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.9 mi (61 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 564 over Stream built?

It was built in 1997, making it 28 years old in 2025.

What condition is SR 564 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SR 564 over Stream carry?

About 358 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 564 over Stream?

The structure is 42 ft (12.9 m) long with a longest span of 41 ft (12.5 m) and a deck 34 ft wide.

Who owns SR 564 over Stream?

It is owned by the State Highway Agency.