US Bridges

SR 60 over Over Big Run

Good

Muskingum County, Ohio · 5.9 M S of JCT SR 16 · Structure no. 6002196

Built
1957
68 years old, rebuilt 2013
Condition
Good
inspected August 2024
Type
Slab
Concrete Continuous
Length
67 ft
3 main spans
Daily traffic
2,048
2015 count
Owner
State
State Highway Agency

About this bridge

SR 60 over Over Big Run is a concrete continuous slab carrying SR 60 over Over Big Run in Muskingum County, Ohio. It was built in 1957 and reconstructed in 2013, so it is 68 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,048 vehicles a day, roughly 11% of them trucks, projected to reach 2,843 by 2035. The structure is 67 ft (20.4 m) long and 40 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesSR 60
CrossesOver Big Run
Location5.9 M S of JCT SR 16
RouteState Highway 60
StateOhio
Coordinates40.09278, -82.06226
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating63.2 US tons
Inventory rating43.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length67 ft (20.4 m)
Longest span25 ft (7.6 m)
Deck width40 ft (12.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,048 (2015)
Projected traffic2,843 by 2035
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 60 over Over Big Run built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2013.

What condition is SR 60 over Over Big Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 60 over Over Big Run carry?

About 2,048 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is SR 60 over Over Big Run?

The structure is 67 ft (20.4 m) long with a longest span of 25 ft (7.6 m) and a deck 40 ft wide.

Who owns SR 60 over Over Big Run?

It is owned by the State Highway Agency.