US Bridges

SR 60 over Big Run

Good

Muskingum County, Ohio · 7.2MI.S.OF SR16 · Structure no. 6002188

Built
1996
29 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
39 ft
1 main span
Daily traffic
2,048
2015 count
Owner
State
State Highway Agency

About this bridge

SR 60 over Big Run is a prestressed concrete box beam or girders - multiple carrying SR 60 over Big Run in Muskingum County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,048 vehicles a day, roughly 11% of them trucks, projected to reach 2,843 by 2035. The structure is 39 ft (11.9 m) long and 44 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesSR 60
CrossesBig Run
Location7.2MI.S.OF SR16
RouteState Highway 60
StateOhio
Coordinates40.07455, -82.06216
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating28.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length39 ft (11.9 m)
Longest span38 ft (11.6 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,048 (2015)
Projected traffic2,843 by 2035
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 60 over Big Run built?

It was built in 1996, making it 29 years old in 2025.

What condition is SR 60 over Big Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 60 over Big Run carry?

About 2,048 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is SR 60 over Big Run?

The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 44 ft wide.

Who owns SR 60 over Big Run?

It is owned by the State Highway Agency.