Diamond Mill M0217 over Trib. to Poplar Run
FairMontgomery County, Ohio · 5.7 Miles North of SR35 · Structure no. 5765846
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 4,349
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Diamond Mill M0217 over Trib. to Poplar Run is a steel stringer/multi-beam or girder carrying Diamond Mill M0217 over Trib. to Poplar Run in Montgomery County, Ohio. It was built in 1979, so it is 46 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,349 vehicles a day, roughly 5% of them trucks, projected to reach 6,036 by 2038. The structure is 34 ft (10.4 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Diamond Mill M0217 over Trib. to Poplar Run built?
It was built in 1979, making it 46 years old in 2025.
What condition is Diamond Mill M0217 over Trib. to Poplar Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Diamond Mill M0217 over Trib. to Poplar Run carry?
About 4,349 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Diamond Mill M0217 over Trib. to Poplar Run?
The structure is 34 ft (10.4 m) long with a longest span of 30 ft (9.1 m) and a deck 30 ft wide.
Who owns Diamond Mill M0217 over Trib. to Poplar Run?
It is owned by the County Highway Agency.