Crestway M0019 over Razor Run
GoodMontgomery County, Ohio · 500 S. of Kimmel Road · Structure no. 5769248
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 624
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Crestway M0019 over Razor Run is a prestressed concrete box beam or girders - multiple carrying Crestway M0019 over Razor Run in Montgomery County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 624 vehicles a day, roughly 4% of them trucks, projected to reach 866 by 2037. The structure is 62 ft (18.9 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Crestway M0019 over Razor Run built?
It was built in 2002, making it 23 years old in 2025.
What condition is Crestway M0019 over Razor Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Crestway M0019 over Razor Run carry?
About 624 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Crestway M0019 over Razor Run?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 32 ft wide.
Who owns Crestway M0019 over Razor Run?
It is owned by the County Highway Agency.