US Bridges

Washington Street over Great Miami River

Fair

Montgomery County, Ohio · 200 Ft E of Ec Moses Blvd · Structure no. 5760070

Built
2007
18 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
632 ft
7 main spans
Daily traffic
7,137
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Washington Street over Great Miami River is a prestressed concrete continuous box beam or girders - multiple carrying Washington Street over Great Miami River in Montgomery County, Ohio. It was built in 2007, so it is 18 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,137 vehicles a day, roughly 5% of them trucks, projected to reach 9,906 by 2035. The structure is 632 ft (192.6 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWashington Street
CrossesGreat Miami River
Location200 Ft E of Ec Moses Blvd
RouteCity Street 4996
StateOhio
Coordinates39.75006, -84.19904
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating77.8 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 25 or greater
Structure length632 ft (192.6 m)
Longest span90 ft (27.4 m)
Deck width59 ft (18.1 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,137 (2015)
Projected traffic9,906 by 2035
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Washington Street over Great Miami River built?

It was built in 2007, making it 18 years old in 2025.

What condition is Washington Street over Great Miami River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Washington Street over Great Miami River carry?

About 7,137 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Washington Street over Great Miami River?

The structure is 632 ft (192.6 m) long with a longest span of 90 ft (27.4 m) and a deck 59 ft wide.

Who owns Washington Street over Great Miami River?

It is owned by the City or Municipal Highway Agency.