US Bridges

Nb/Sb IR-75 over Third St.; CR194A

Good

Montgomery County, Ohio · .25MI. N. of Jct. SR-4 · Structure no. 5707838

Built
2014
11 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
132 ft
1 main span
Daily traffic
123,721
2015 count
Owner
State
State Highway Agency

About this bridge

Nb/Sb IR-75 over Third St.; CR194A is a steel stringer/multi-beam or girder carrying Nb/Sb IR-75 over Third St.; CR194A in Montgomery County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 123,721 vehicles a day, roughly 14% of them trucks, projected to reach 171,725 by 2035. The structure is 132 ft (40.2 m) long and 156 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNb/Sb IR-75
CrossesThird St.; CR194A
Location.25MI. N. of Jct. SR-4
RouteInterstate 75
StateOhio
Coordinates39.75758, -84.20265
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.1 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length132 ft (40.2 m)
Longest span132 ft (40.2 m)
Deck width156 ft (47.7 m)
Roadway width156 ft (47.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic123,721 (2015)
Projected traffic171,725 by 2035
Trucks14%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nb/Sb IR-75 over Third St.; CR194A built?

It was built in 2014, making it 11 years old in 2025.

What condition is Nb/Sb IR-75 over Third St.; CR194A in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Nb/Sb IR-75 over Third St.; CR194A carry?

About 123,721 vehicles per day (2015 count), of which roughly 14% are trucks.

How long is Nb/Sb IR-75 over Third St.; CR194A?

The structure is 132 ft (40.2 m) long with a longest span of 132 ft (40.2 m) and a deck 156 ft wide.

Who owns Nb/Sb IR-75 over Third St.; CR194A?

It is owned by the State Highway Agency.