US Bridges

Ramp to SB I-75 over Albany Street

Good

Montgomery County, Ohio · .13MI.S. of Jct. USR35 · Structure no. 5707367

Built
2020
5 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
76 ft
1 main span
Daily traffic
21,290
2020 count
Owner
State
State Highway Agency

About this bridge

Ramp to SB I-75 over Albany Street is a prestressed concrete stringer/multi-beam or girder carrying Ramp to SB I-75 over Albany Street in Montgomery County, Ohio. It was built in 2020, so it is 5 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,290 vehicles a day, roughly 4% of them trucks, projected to reach 21,920 by 2040. The structure is 76 ft (23.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRamp to SB I-75
CrossesAlbany Street
Location.13MI.S. of Jct. USR35
RouteInterstate 75
StateOhio
Coordinates39.74587, -84.20557
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length76 ft (23.3 m)
Longest span73 ft (22.1 m)
Deck width24 ft (7.2 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,290 (2020)
Projected traffic21,920 by 2040
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to SB I-75 over Albany Street built?

It was built in 2020, making it 5 years old in 2025.

What condition is Ramp to SB I-75 over Albany Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Ramp to SB I-75 over Albany Street carry?

About 21,290 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is Ramp to SB I-75 over Albany Street?

The structure is 76 ft (23.3 m) long with a longest span of 73 ft (22.1 m) and a deck 24 ft wide.

Who owns Ramp to SB I-75 over Albany Street?

It is owned by the State Highway Agency.