Piqua-Lockington over Flood Channel Miami Rive
FairMiami County, Ohio · 0.18 N of TR202 · Structure no. 5536200
- Built
- 1936
- 89 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 1,373
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Piqua-Lockington over Flood Channel Miami Rive is a concrete slab carrying Piqua-Lockington over Flood Channel Miami Rive in Miami County, Ohio. It was built in 1936, so it is 89 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,373 vehicles a day, roughly 8% of them trucks, projected to reach 1,906 by 2038. The structure is 24 ft (7.3 m) long and 35 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Piqua-Lockington over Flood Channel Miami Rive built?
It was built in 1936, making it 89 years old in 2025.
What condition is Piqua-Lockington over Flood Channel Miami Rive in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Piqua-Lockington over Flood Channel Miami Rive carry?
About 1,373 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Piqua-Lockington over Flood Channel Miami Rive?
The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.7 m) and a deck 35 ft wide.
Who owns Piqua-Lockington over Flood Channel Miami Rive?
It is owned by the County Highway Agency.