Piqua-Lockington over Miami River
PoorMiami County, Ohio · 0.03 N of TR202 · Structure no. 5536197
- Built
- 1972
- 53 years old
- Condition
- Poor
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 222 ft
- 4 main spans
- Daily traffic
- 1,373
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Piqua-Lockington over Miami River is a prestressed concrete box beam or girders - multiple carrying Piqua-Lockington over Miami River in Miami County, Ohio. It was built in 1972, so it is 53 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,373 vehicles a day, roughly 8% of them trucks, projected to reach 1,906 by 2038. The structure is 222 ft (67.7 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Piqua-Lockington over Miami River built?
It was built in 1972, making it 53 years old in 2025.
What condition is Piqua-Lockington over Miami River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does Piqua-Lockington over Miami River carry?
About 1,373 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Piqua-Lockington over Miami River?
The structure is 222 ft (67.7 m) long with a longest span of 56 ft (17.1 m) and a deck 24 ft wide.
Who owns Piqua-Lockington over Miami River?
It is owned by the County Highway Agency.