US Bridges

Woodland Avenue over Ir 680

Good

Mahoning County, Ohio · 0.38 MI W of US 62 · Structure no. 5007089

Built
1963
62 years old, rebuilt 2012
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
151 ft
3 main spans
Daily traffic
4,453
2015 count
Owner
State
State Highway Agency

About this bridge

Woodland Avenue over Ir 680 is a steel continuous stringer/multi-beam or girder carrying Woodland Avenue over Ir 680 in Mahoning County, Ohio. It was built in 1963 and reconstructed in 2012, so it is 62 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,453 vehicles a day, roughly 7% of them trucks, projected to reach 68,408 by 2035. The structure is 151 ft (46 m) long and 60 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWoodland Avenue
CrossesIr 680
Location0.38 MI W of US 62
RouteCity Street 2200
StateOhio
Coordinates41.09392, -80.65631
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length151 ft (46 m)
Longest span53 ft (16.2 m)
Deck width60 ft (18.4 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,453 (2015)
Projected traffic68,408 by 2035
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Woodland Avenue over Ir 680 built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2012.

What condition is Woodland Avenue over Ir 680 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Woodland Avenue over Ir 680 carry?

About 4,453 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Woodland Avenue over Ir 680?

The structure is 151 ft (46 m) long with a longest span of 53 ft (16.2 m) and a deck 60 ft wide.

Who owns Woodland Avenue over Ir 680?

It is owned by the State Highway Agency.