US Bridges

I.R. 80 WB over Lipkey RD CR-91

Fair

Mahoning County, Ohio · 3.05 MI W of SR 46 · Structure no. 5002192

Built
1969
56 years old, rebuilt 2007
Condition
Fair
inspected May 2024
Type
Slab
Concrete Continuous
Length
144 ft
2 main spans
Daily traffic
25,070
2015 count
Owner
State
State Highway Agency

About this bridge

I.R. 80 WB over Lipkey RD CR-91 is a concrete continuous slab carrying I.R. 80 WB over Lipkey RD CR-91 in Mahoning County, Ohio. It was built in 1969 and reconstructed in 2007, so it is 56 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,070 vehicles a day, roughly 26% of them trucks, projected to reach 34,797 by 2035. The structure is 144 ft (43.9 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI.R. 80 WB
CrossesLipkey RD CR-91
Location3.05 MI W of SR 46
RouteInterstate 80
StateOhio
Coordinates41.11133, -80.82342
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 25 or greater
Structure length144 ft (43.9 m)
Longest span49 ft (14.9 m)
Deck width25 ft (7.6 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,070 (2015)
Projected traffic34,797 by 2035
Trucks26%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I.R. 80 WB over Lipkey RD CR-91 built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2007.

What condition is I.R. 80 WB over Lipkey RD CR-91 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does I.R. 80 WB over Lipkey RD CR-91 carry?

About 25,070 vehicles per day (2015 count), of which roughly 26% are trucks.

How long is I.R. 80 WB over Lipkey RD CR-91?

The structure is 144 ft (43.9 m) long with a longest span of 49 ft (14.9 m) and a deck 25 ft wide.

Who owns I.R. 80 WB over Lipkey RD CR-91?

It is owned by the State Highway Agency.