Tpk Ramp to CR18 over Ramp C from CR18 to Tpk
GoodMahoning County, Ohio · .4 Mi.N. of Mahoning Ave · Structure no. 5029074
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 263 ft
- 3 main spans
- Daily traffic
- 3,000
- 2013 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Tpk Ramp to CR18 over Ramp C from CR18 to Tpk is a steel continuous stringer/multi-beam or girder carrying Tpk Ramp to CR18 over Ramp C from CR18 to Tpk in Mahoning County, Ohio. It was built in 1998, so it is 27 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,000 vehicles a day, roughly 4% of them trucks, projected to reach 4,164 by 2033. The structure is 263 ft (80.2 m) long and 37 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tpk Ramp to CR18 over Ramp C from CR18 to Tpk built?
It was built in 1998, making it 27 years old in 2025.
What condition is Tpk Ramp to CR18 over Ramp C from CR18 to Tpk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Tpk Ramp to CR18 over Ramp C from CR18 to Tpk carry?
About 3,000 vehicles per day (2013 count), of which roughly 4% are trucks.
How long is Tpk Ramp to CR18 over Ramp C from CR18 to Tpk?
The structure is 263 ft (80.2 m) long with a longest span of 105 ft (32 m) and a deck 37 ft wide.
Who owns Tpk Ramp to CR18 over Ramp C from CR18 to Tpk?
It is owned by the State Toll Authority.