US Bridges

SR 295 over Usr 24

Good

Lucas County, Ohio · JCT Usr 24 & SR 295 · Structure no. 4806514

Built
2011
14 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
183 ft
2 main spans
Daily traffic
2,654
2019 count
Owner
State
State Highway Agency

About this bridge

SR 295 over Usr 24 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 295 over Usr 24 in Lucas County, Ohio. It was built in 2011, so it is 14 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,654 vehicles a day, roughly 11% of them trucks, projected to reach 4,000 by 2039. The structure is 183 ft (55.8 m) long and 55 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

CarriesSR 295
CrossesUsr 24
LocationJCT Usr 24 & SR 295
RouteState Highway 295
StateOhio
Coordinates41.45568, -83.82568
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length183 ft (55.8 m)
Longest span90 ft (27.4 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,654 (2019)
Projected traffic4,000 by 2039
Trucks11%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 295 over Usr 24 built?

It was built in 2011, making it 14 years old in 2025.

What condition is SR 295 over Usr 24 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 295 over Usr 24 carry?

About 2,654 vehicles per day (2019 count), of which roughly 11% are trucks.

How long is SR 295 over Usr 24?

The structure is 183 ft (55.8 m) long with a longest span of 90 ft (27.4 m) and a deck 55 ft wide.

Who owns SR 295 over Usr 24?

It is owned by the State Highway Agency.