US Bridges

Doran Rd. over Harris Ditch 0968

Fair

Lucas County, Ohio · 0.4 Mi. E. of Midway Rd. · Structure no. 4832051

Built
1982
43 years old
Condition
Fair
inspected October 2024
Type
Slab
Concrete
Length
49 ft
1 main span
Daily traffic
797
2015 count
Owner
County
County Highway Agency

About this bridge

Doran Rd. over Harris Ditch 0968 is a concrete slab carrying Doran Rd. over Harris Ditch 0968 in Lucas County, Ohio. It was built in 1982, so it is 43 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 797 vehicles a day, roughly 8% of them trucks, projected to reach 1,106 by 2035. The structure is 49 ft (14.9 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDoran Rd.
CrossesHarris Ditch 0968
Location0.4 Mi. E. of Midway Rd.
RouteCounty Highway T0142
StateOhio
Coordinates41.48099, -83.81901
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.1 US tons
Inventory rating31.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length49 ft (14.9 m)
Longest span45 ft (13.7 m)
Deck width30 ft (9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic797 (2015)
Projected traffic1,106 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Doran Rd. over Harris Ditch 0968 built?

It was built in 1982, making it 43 years old in 2025.

What condition is Doran Rd. over Harris Ditch 0968 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Doran Rd. over Harris Ditch 0968 carry?

About 797 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is Doran Rd. over Harris Ditch 0968?

The structure is 49 ft (14.9 m) long with a longest span of 45 ft (13.7 m) and a deck 30 ft wide.

Who owns Doran Rd. over Harris Ditch 0968?

It is owned by the County Highway Agency.