Doran Rd. over Harris Ditch 0968
FairLucas County, Ohio · 0.4 Mi. E. of Midway Rd. · Structure no. 4832051
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete
- Length
- 49 ft
- 1 main span
- Daily traffic
- 797
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Doran Rd. over Harris Ditch 0968 is a concrete slab carrying Doran Rd. over Harris Ditch 0968 in Lucas County, Ohio. It was built in 1982, so it is 43 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 797 vehicles a day, roughly 8% of them trucks, projected to reach 1,106 by 2035. The structure is 49 ft (14.9 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Doran Rd. over Harris Ditch 0968 built?
It was built in 1982, making it 43 years old in 2025.
What condition is Doran Rd. over Harris Ditch 0968 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Doran Rd. over Harris Ditch 0968 carry?
About 797 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Doran Rd. over Harris Ditch 0968?
The structure is 49 ft (14.9 m) long with a longest span of 45 ft (13.7 m) and a deck 30 ft wide.
Who owns Doran Rd. over Harris Ditch 0968?
It is owned by the County Highway Agency.