US Bridges

Ir 280 Ramp over Bikeway Greenbelt

Good

Lucas County, Ohio · JCT Ir 280 and SR 25 · Structure no. 4806247

Built
2000
25 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
66 ft
1 main span
Daily traffic
4,807
2019 count
Owner
State
State Highway Agency

About this bridge

Ir 280 Ramp over Bikeway Greenbelt is a steel stringer/multi-beam or girder carrying Ir 280 Ramp over Bikeway Greenbelt in Lucas County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,807 vehicles a day, roughly 7% of them trucks, projected to reach 5,250 by 2039. The structure is 66 ft (20.1 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesIr 280 Ramp
CrossesBikeway Greenbelt
LocationJCT Ir 280 and SR 25
RouteInterstate 280
StateOhio
Coordinates41.6764, -83.51601
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.9 US tons
Inventory rating53.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length66 ft (20.1 m)
Longest span64 ft (19.5 m)
Deck width31 ft (9.4 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,807 (2019)
Projected traffic5,250 by 2039
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 280 Ramp over Bikeway Greenbelt built?

It was built in 2000, making it 25 years old in 2025.

What condition is Ir 280 Ramp over Bikeway Greenbelt in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Ir 280 Ramp over Bikeway Greenbelt carry?

About 4,807 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is Ir 280 Ramp over Bikeway Greenbelt?

The structure is 66 ft (20.1 m) long with a longest span of 64 ft (19.5 m) and a deck 31 ft wide.

Who owns Ir 280 Ramp over Bikeway Greenbelt?

It is owned by the State Highway Agency.