US Bridges

Ir 75 over Stickney Ave.

Good

Lucas County, Ohio · Ir 75 over Stickney Ave. · Structure no. 4804058

Built
1967
58 years old, rebuilt 2017
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
169 ft
3 main spans
Daily traffic
75,973
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 75 over Stickney Ave. is a steel continuous stringer/multi-beam or girder carrying Ir 75 over Stickney Ave. in Lucas County, Ohio. It was built in 1967 and reconstructed in 2017, so it is 58 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75,973 vehicles a day, roughly 19% of them trucks, projected to reach 105,451 by 2035. The structure is 169 ft (51.5 m) long and 145 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 75
CrossesStickney Ave.
LocationIr 75 over Stickney Ave.
RouteInterstate 75
StateOhio
Coordinates41.68985, -83.52724
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89 US tons
Inventory rating68.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length169 ft (51.5 m)
Longest span82 ft (25 m)
Deck width145 ft (44.2 m)
Roadway width134 ft (40.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75,973 (2015)
Projected traffic105,451 by 2035
Trucks19%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 over Stickney Ave. built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2017.

What condition is Ir 75 over Stickney Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Ir 75 over Stickney Ave. carry?

About 75,973 vehicles per day (2015 count), of which roughly 19% are trucks.

How long is Ir 75 over Stickney Ave.?

The structure is 169 ft (51.5 m) long with a longest span of 82 ft (25 m) and a deck 145 ft wide.

Who owns Ir 75 over Stickney Ave.?

It is owned by the State Highway Agency.