US Bridges

SR-708 over Channel to Indian Lake

Good

Logan County, Ohio · .39MI.N. of Jct. SR-366 · Structure no. 4604156

Built
2013
12 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
86 ft
3 main spans
Daily traffic
2,199
2015 count
Owner
State
State Highway Agency

About this bridge

SR-708 over Channel to Indian Lake is a concrete continuous slab carrying SR-708 over Channel to Indian Lake in Logan County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,199 vehicles a day, roughly 3% of them trucks, projected to reach 3,052 by 2035. The structure is 86 ft (26.2 m) long and 36 ft wide.

CarriesSR-708
CrossesChannel to Indian Lake
Location.39MI.N. of Jct. SR-366
RouteState Highway 708
StateOhio
Coordinates40.47429, -83.88666
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating66.5 US tons
Inventory rating51 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length86 ft (26.2 m)
Longest span32 ft (9.9 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,199 (2015)
Projected traffic3,052 by 2035
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-708 over Channel to Indian Lake built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR-708 over Channel to Indian Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR-708 over Channel to Indian Lake carry?

About 2,199 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is SR-708 over Channel to Indian Lake?

The structure is 86 ft (26.2 m) long with a longest span of 32 ft (9.9 m) and a deck 36 ft wide.

Who owns SR-708 over Channel to Indian Lake?

It is owned by the State Highway Agency.