Usr 33 over Great Miami River
FairLogan County, Ohio · 2.7MI.SE. of Jct. SR-235 · Structure no. 4600223
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 8,125
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 33 over Great Miami River is a prestressed concrete continuous box beam or girders - multiple carrying Usr 33 over Great Miami River in Logan County, Ohio. It was built in 1984, so it is 41 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,125 vehicles a day, roughly 19% of them trucks, projected to reach 11,278 by 2035. The structure is 153 ft (46.6 m) long and 40 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 33 over Great Miami River built?
It was built in 1984, making it 41 years old in 2025.
What condition is Usr 33 over Great Miami River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Usr 33 over Great Miami River carry?
About 8,125 vehicles per day (2015 count), of which roughly 19% are trucks.
How long is Usr 33 over Great Miami River?
The structure is 153 ft (46.6 m) long with a longest span of 50 ft (15.2 m) and a deck 40 ft wide.
Who owns Usr 33 over Great Miami River?
It is owned by the State Highway Agency.