I-90EB over I-271 over UP 271NB Togo 90WB Dn 27
FairLake County, Ohio · 1.63 MI E of SR-84 JCT · Structure no. 4303482
- Built
- 1962
- 63 years old, rebuilt 2010
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 594 ft
- 6 main spans
- Daily traffic
- 7,372
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I-90EB over I-271 over UP 271NB Togo 90WB Dn 27 is a steel continuous stringer/multi-beam or girder carrying I-90EB over I-271 over UP 271NB Togo 90WB Dn 27 in Lake County, Ohio. It was built in 1962 and reconstructed in 2010, so it is 63 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,372 vehicles a day, roughly 9% of them trucks, projected to reach 10,232 by 2035. The structure is 594 ft (181.1 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-90EB over I-271 over UP 271NB Togo 90WB Dn 27 built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2010.
What condition is I-90EB over I-271 over UP 271NB Togo 90WB Dn 27 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I-90EB over I-271 over UP 271NB Togo 90WB Dn 27 carry?
About 7,372 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is I-90EB over I-271 over UP 271NB Togo 90WB Dn 27?
The structure is 594 ft (181.1 m) long with a longest span of 125 ft (38.1 m) and a deck 38 ft wide.
Who owns I-90EB over I-271 over UP 271NB Togo 90WB Dn 27?
It is owned by the State Highway Agency.