US Bridges

W Main Street over Givens Run

Good

Jackson County, Ohio · .3 MI W of N High ST · Structure no. 4061861

Built
1935
90 years old, rebuilt 1989
Condition
Good
inspected July 2023
Type
Slab
Concrete
Length
27 ft
1 main span
Daily traffic
466
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

W Main Street over Givens Run is a concrete slab carrying W Main Street over Givens Run in Jackson County, Ohio. It was built in 1935 and reconstructed in 1989, so it is 90 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 466 vehicles a day, roughly 5% of them trucks, projected to reach 647 by 2040. The structure is 27 ft (8.2 m) long and 23 ft wide.

CarriesW Main Street
CrossesGivens Run
Location.3 MI W of N High ST
RouteCity Street 79
StateOhio
Coordinates39.05816, -82.65164
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating107.1 US tons
Inventory rating100 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span23 ft (7 m)
Deck width23 ft (7 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic466 (2020)
Projected traffic647 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Main Street over Givens Run built?

It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1989.

What condition is W Main Street over Givens Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does W Main Street over Givens Run carry?

About 466 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is W Main Street over Givens Run?

The structure is 27 ft (8.2 m) long with a longest span of 23 ft (7 m) and a deck 23 ft wide.

Who owns W Main Street over Givens Run?

It is owned by the City or Municipal Highway Agency.