US Bridges

County RD 16 over Plum Run

Fair

Harrison County, Ohio · 0.5 MI N of JCT SR 22 · Structure no. 3432475

Built
1900
125 years old, rebuilt 1991
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
26 ft
1 main span
Daily traffic
540
2015 count
Owner
County
County Highway Agency

About this bridge

County RD 16 over Plum Run is a steel stringer/multi-beam or girder carrying County RD 16 over Plum Run in Harrison County, Ohio. It was built in 1900 and reconstructed in 1991, so it is 125 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 540 vehicles a day, roughly 8% of them trucks, projected to reach 750 by 2035. The structure is 26 ft (7.9 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCounty RD 16
CrossesPlum Run
Location0.5 MI N of JCT SR 22
RouteCounty Highway C0016
StateOhio
Coordinates40.19402, -81.19832
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span21 ft (6.4 m)
Deck width20 ft (6.2 m)
Roadway width19 ft (5.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic540 (2015)
Projected traffic750 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$77,000
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 16 over Plum Run built?

It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1991.

What condition is County RD 16 over Plum Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does County RD 16 over Plum Run carry?

About 540 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is County RD 16 over Plum Run?

The structure is 26 ft (7.9 m) long with a longest span of 21 ft (6.4 m) and a deck 20 ft wide.

Who owns County RD 16 over Plum Run?

It is owned by the County Highway Agency.