Usr 22 over Piedmont Dam Spillway
FairHarrison County, Ohio · 1.77 Mi. E. of JCT SR 800 · Structure no. 3400514
- Built
- 1937
- 88 years old, rebuilt 1996
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 2,503
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 22 over Piedmont Dam Spillway is a steel continuous stringer/multi-beam or girder carrying Usr 22 over Piedmont Dam Spillway in Harrison County, Ohio. It was built in 1937 and reconstructed in 1996, so it is 88 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,503 vehicles a day, roughly 24% of them trucks, projected to reach 3,474 by 2035. The structure is 165 ft (50.3 m) long and 39 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 22 over Piedmont Dam Spillway built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1996.
What condition is Usr 22 over Piedmont Dam Spillway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Usr 22 over Piedmont Dam Spillway carry?
About 2,503 vehicles per day (2015 count), of which roughly 24% are trucks.
How long is Usr 22 over Piedmont Dam Spillway?
The structure is 165 ft (50.3 m) long with a longest span of 70 ft (21.2 m) and a deck 39 ft wide.
Who owns Usr 22 over Piedmont Dam Spillway?
It is owned by the State Highway Agency.