US Bridges

State Route 258 over Laurel Creek

Good

Harrison County, Ohio · 2.74 MI N of Tusc.Co.Line · Structure no. 3402746

Built
2000
25 years old
Condition
Good
inspected February 2025
Type
Slab
Concrete Continuous
Length
116 ft
3 main spans
Daily traffic
225
2015 count
Owner
State
State Highway Agency

About this bridge

State Route 258 over Laurel Creek is a concrete continuous slab carrying State Route 258 over Laurel Creek in Harrison County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 225 vehicles a day, roughly 6% of them trucks, projected to reach 312 by 2035. The structure is 116 ft (35.3 m) long and 31 ft wide. If it were closed, the detour would be 24.2 mi (39 km).

CarriesState Route 258
CrossesLaurel Creek
Location2.74 MI N of Tusc.Co.Line
RouteState Highway 258
StateOhio
Coordinates40.3019, -81.32797
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length116 ft (35.3 m)
Longest span44 ft (13.4 m)
Deck width31 ft (9.5 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic225 (2015)
Projected traffic312 by 2035
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.2 mi (39 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was State Route 258 over Laurel Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is State Route 258 over Laurel Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does State Route 258 over Laurel Creek carry?

About 225 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is State Route 258 over Laurel Creek?

The structure is 116 ft (35.3 m) long with a longest span of 44 ft (13.4 m) and a deck 31 ft wide.

Who owns State Route 258 over Laurel Creek?

It is owned by the State Highway Agency.