SR 235 over Ir 75
GoodPosted for loadHancock County, Ohio · 6.53 Mi. North of USR30 · Structure no. 3204448
- Built
- 1963
- 62 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 294 ft
- 4 main spans
- Daily traffic
- 1,822
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 235 over Ir 75 is a steel continuous stringer/multi-beam or girder carrying SR 235 over Ir 75 in Hancock County, Ohio. It was built in 1963, so it is 62 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 1,822 vehicles a day, roughly 6% of them trucks, projected to reach 2,529 by 2035. The structure is 294 ft (89.5 m) long and 35 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 235 over Ir 75 built?
It was built in 1963, making it 62 years old in 2025.
What condition is SR 235 over Ir 75 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does SR 235 over Ir 75 carry?
About 1,822 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is SR 235 over Ir 75?
The structure is 294 ft (89.5 m) long with a longest span of 85 ft (25.9 m) and a deck 35 ft wide.
Who owns SR 235 over Ir 75?
It is owned by the State Highway Agency.