Han CO RD 12 over Ottawa Creek
FairHancock County, Ohio · 0.41 MI N CR 24 · Structure no. 3235807
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 346
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Han CO RD 12 over Ottawa Creek is a steel stringer/multi-beam or girder carrying Han CO RD 12 over Ottawa Creek in Hancock County, Ohio. It was built in 1990, so it is 35 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 346 vehicles a day, roughly 10% of them trucks, projected to reach 436 by 2041. The structure is 42 ft (12.9 m) long and 21 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Han CO RD 12 over Ottawa Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Han CO RD 12 over Ottawa Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Han CO RD 12 over Ottawa Creek carry?
About 346 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Han CO RD 12 over Ottawa Creek?
The structure is 42 ft (12.9 m) long with a longest span of 39 ft (11.9 m) and a deck 21 ft wide.
Who owns Han CO RD 12 over Ottawa Creek?
It is owned by the County Highway Agency.