US Bridges

CR 313 over Ir 75 & Aurand Run

GoodPosted for load

Hancock County, Ohio · Hancock County Lib.Twp. · Structure no. 3202828

Built
1963
62 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
383 ft
4 main spans
Daily traffic
5,691
2015 count
Owner
State
State Highway Agency

About this bridge

CR 313 over Ir 75 & Aurand Run is a steel continuous stringer/multi-beam or girder carrying CR 313 over Ir 75 & Aurand Run in Hancock County, Ohio. It was built in 1963, so it is 62 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 5,691 vehicles a day, roughly 5% of them trucks, projected to reach 43,104 by 2035. The structure is 383 ft (116.7 m) long and 35 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCR 313
CrossesIr 75 & Aurand Run
LocationHancock County Lib.Twp.
RouteCounty Highway C0313
StateOhio
Coordinates41.01089, -83.68674
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4 (+1 approach)
Design loadOther
Structure length383 ft (116.7 m)
Longest span96 ft (29.3 m)
Deck width35 ft (10.6 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,691 (2015)
Projected traffic43,104 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 313 over Ir 75 & Aurand Run built?

It was built in 1963, making it 62 years old in 2025.

What condition is CR 313 over Ir 75 & Aurand Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does CR 313 over Ir 75 & Aurand Run carry?

About 5,691 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is CR 313 over Ir 75 & Aurand Run?

The structure is 383 ft (116.7 m) long with a longest span of 96 ft (29.3 m) and a deck 35 ft wide.

Who owns CR 313 over Ir 75 & Aurand Run?

It is owned by the State Highway Agency.