US Bridges

C144 Harrison ST over Ir 75

Good

Hancock County, Ohio · S. of SR68/15 Interchange · Structure no. 3202860

Built
2018
7 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
478 ft
3 main spans
Daily traffic
1,610
2016 count
Owner
State
State Highway Agency

About this bridge

C144 Harrison ST over Ir 75 is a steel continuous stringer/multi-beam or girder carrying C144 Harrison ST over Ir 75 in Hancock County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,610 vehicles a day, roughly 7% of them trucks, projected to reach 2,013 by 2036. The structure is 478 ft (145.8 m) long and 37 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesC144 Harrison ST
CrossesIr 75
LocationS. of SR68/15 Interchange
RouteCity Street C0144
StateOhio
Coordinates41.02294, -83.68148
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating57.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length478 ft (145.8 m)
Longest span186 ft (56.7 m)
Deck width37 ft (11.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,610 (2016)
Projected traffic2,013 by 2036
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of relocation of road
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was C144 Harrison ST over Ir 75 built?

It was built in 2018, making it 7 years old in 2025.

What condition is C144 Harrison ST over Ir 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does C144 Harrison ST over Ir 75 carry?

About 1,610 vehicles per day (2016 count), of which roughly 7% are trucks.

How long is C144 Harrison ST over Ir 75?

The structure is 478 ft (145.8 m) long with a longest span of 186 ft (56.7 m) and a deck 37 ft wide.

Who owns C144 Harrison ST over Ir 75?

It is owned by the State Highway Agency.