US Bridges

SR 12 over Aurand Run

Good

Hancock County, Ohio · 2MI. West of I-75 · Structure no. 3200205

Built
2005
20 years old
Condition
Good
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
86 ft
1 main span
Daily traffic
5,073
2015 count
Owner
State
State Highway Agency

About this bridge

SR 12 over Aurand Run is a prestressed concrete box beam or girders - multiple carrying SR 12 over Aurand Run in Hancock County, Ohio. It was built in 2005, so it is 20 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,073 vehicles a day, roughly 9% of them trucks, projected to reach 7,041 by 2035. The structure is 86 ft (26.3 m) long and 44 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 12
CrossesAurand Run
Location2MI. West of I-75
RouteState Highway 12
StateOhio
Coordinates41.02974, -83.71327
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating107.1 US tons
Inventory rating60.7 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length86 ft (26.3 m)
Longest span85 ft (25.9 m)
Deck width44 ft (13.5 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,073 (2015)
Projected traffic7,041 by 2035
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 12 over Aurand Run built?

It was built in 2005, making it 20 years old in 2025.

What condition is SR 12 over Aurand Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does SR 12 over Aurand Run carry?

About 5,073 vehicles per day (2015 count), of which roughly 9% are trucks.

How long is SR 12 over Aurand Run?

The structure is 86 ft (26.3 m) long with a longest span of 85 ft (25.9 m) and a deck 44 ft wide.

Who owns SR 12 over Aurand Run?

It is owned by the State Highway Agency.