US Bridges

Linn Street over IR75 Gest ST Winchell

Fair

Hamilton County, Ohio · .5 MI N of SR 264 · Structure no. 3109097

Built
1961
64 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
426 ft
7 main spans
Daily traffic
10,417
2015 count
Owner
State
State Highway Agency

About this bridge

Linn Street over IR75 Gest ST Winchell is a steel continuous stringer/multi-beam or girder carrying Linn Street over IR75 Gest ST Winchell in Hamilton County, Ohio. It was built in 1961, so it is 64 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,417 vehicles a day, roughly 5% of them trucks, projected to reach 14,459 by 2035. The structure is 426 ft (129.8 m) long and 89 ft wide.

CarriesLinn Street
CrossesIR75 Gest ST Winchell
Location.5 MI N of SR 264
RouteCity Street 8625
StateOhio
Coordinates39.10413, -84.52905
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.1 US tons
Inventory rating32.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadH 20
Structure length426 ft (129.8 m)
Longest span85 ft (25.9 m)
Deck width89 ft (27.1 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,417 (2015)
Projected traffic14,459 by 2035
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Linn Street over IR75 Gest ST Winchell built?

It was built in 1961, making it 64 years old in 2025.

What condition is Linn Street over IR75 Gest ST Winchell in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Linn Street over IR75 Gest ST Winchell carry?

About 10,417 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Linn Street over IR75 Gest ST Winchell?

The structure is 426 ft (129.8 m) long with a longest span of 85 ft (25.9 m) and a deck 89 ft wide.

Who owns Linn Street over IR75 Gest ST Winchell?

It is owned by the State Highway Agency.