US Bridges

Ninth ST over Gest STREET;I75&RAMPS

Fair

Hamilton County, Ohio · .3 MI N of SR 264 Da · Structure no. 3109038

Built
1963
62 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
535 ft
5 main spans
Daily traffic
19,457
2015 count
Owner
State
State Highway Agency

About this bridge

Ninth ST over Gest STREET;I75&RAMPS is a steel continuous stringer/multi-beam or girder carrying Ninth ST over Gest STREET;I75&RAMPS in Hamilton County, Ohio. It was built in 1963, so it is 62 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 19,457 vehicles a day, roughly 7% of them trucks, projected to reach 202,505 by 2035. The structure is 535 ft (163.1 m) long and 42 ft wide.

CarriesNinth ST
CrossesGest STREET;I75&RAMPS
Location.3 MI N of SR 264 Da
RouteCity Street 3004
StateOhio
Coordinates39.10342, -84.52579
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.9 US tons
Inventory rating32.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadH 20
Structure length535 ft (163.1 m)
Longest span121 ft (36.9 m)
Deck width42 ft (12.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,457 (2015)
Projected traffic202,505 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ninth ST over Gest STREET;I75&RAMPS built?

It was built in 1963, making it 62 years old in 2025.

What condition is Ninth ST over Gest STREET;I75&RAMPS in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Ninth ST over Gest STREET;I75&RAMPS carry?

About 19,457 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Ninth ST over Gest STREET;I75&RAMPS?

The structure is 535 ft (163.1 m) long with a longest span of 121 ft (36.9 m) and a deck 42 ft wide.

Who owns Ninth ST over Gest STREET;I75&RAMPS?

It is owned by the State Highway Agency.