LIB-30 Bish RD over Poplar CR (bish RD Nw)
FairFairfield County, Ohio · 0.8 MI W of Bader RD NW · Structure no. 2337304
- Built
- 1923
- 102 years old, rebuilt 1988
- Condition
- Fair
- inspected November 2024
- Type
- Truss - Thru
- Steel
- Length
- 74 ft
- 1 main span
- Daily traffic
- 324
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
LIB-30 Bish RD over Poplar CR (bish RD Nw) is a steel truss - thru carrying LIB-30 Bish RD over Poplar CR (bish RD Nw) in Fairfield County, Ohio. It was built in 1923 and reconstructed in 1988, so it is 102 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 324 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 74 ft (22.6 m) long and 20 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LIB-30 Bish RD over Poplar CR (bish RD Nw) built?
It was built in 1923, making it 102 years old in 2025. It was reconstructed in 1988.
What condition is LIB-30 Bish RD over Poplar CR (bish RD Nw) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does LIB-30 Bish RD over Poplar CR (bish RD Nw) carry?
About 324 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is LIB-30 Bish RD over Poplar CR (bish RD Nw)?
The structure is 74 ft (22.6 m) long with a longest span of 72 ft (21.9 m) and a deck 20 ft wide.
Who owns LIB-30 Bish RD over Poplar CR (bish RD Nw)?
It is owned by the County Highway Agency.